Senior Project Planning and Control Manager
Adani Enterprises Ltd
Apply on company website
Senior Project Planning and Control Manager
Adani Enterprises Ltd
Ahmedabad
Not disclosed
Job Details
Job Description
Central Project Planning & Control
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; }
1) Central Planning & Integrated Master Scheduling- Develop and own the Integrated Master Plan (IMP) and Integrated Master Schedule (IMS) for multi-utility smart metering programs.
- Define WBS, activity sequencing, dependencies, critical path, and milestone baselines for:
- Meter & modem procurement, QA/QC, dispatch
- Field installation & commissioning (urban/rural)
- Communication network readiness (RF/Cellular/Hybrid), SIM/APN readiness
- HES/MDMS configuration, integrations (billing/CRM), data migration
- UAT, go-live, stabilization, and performance tuning
- Ensure alignment between utility contract milestones, field capacity plans, and vendor commitments.
- Build robust project controls framework: baselines, change control, measurement rules, and reporting cadence.
- Track progress using EVM / SPI / CPI, planned vs. actual, and forecast to complete (ETC/EAC).
- Run weekly and monthly progress reviews with all stakeholders and drive corrective/preventive actions.
- Design a central governance model: stage gates, RAG status, escalation matrix, and meeting structure.
- Provide leadership with crisp insights through dashboards:
- Installations/day, per team productivity, revisit rates
- Meter-to-cash journey readiness (HES/MDMS/billing)
- Comm success rate, data availability, read rates
- Inventory health, transit losses/damages, aging
- Utility approvals, RoW constraints, safety performance
- Ensure “single version of truth” across regions, EPCs, and vendors.
- Maintain and drive closure of RAID logs (Risks, Assumptions, Issues, Dependencies).
- Lead what-if simulations and re-baselining for major changes (scope/utility demand plan/vendor constraints).
- Own the change control process for schedule/cost impact and ensure stakeholder sign-off.
- Define and optimize deployment capacity: crew sizing, productivity norms, route planning, and peak loads.
- Collaborate with execution teams to build micro-plans: ward/feeder-wise/DT-wise rollout plans.
- Plan readiness of HES/MDMS/billing integration resources with IT/OT teams.
- Ensure compliance to contractual SLAs/milestones, LD exposure tracking, and mitigation plans.
- Coordinate with Utilities/DISCOMs for approvals: consumer indexing, meter change permissions, go-live readiness.
- Drive synchronized planning with OEMs, logistics partners, installation agencies, system integrators, telecom partners.
- Track vendor deliverables: manufacturing schedules, FAT/SAT, dispatch plans, spares readiness, and RMA cycle.
- Institutionalize best practices, templates, SOPs, and PMO playbooks across projects.
- Implement / enhance project systems (e.g., MS Project / Primavera / Power BI / ERP integration).
- Lead continuous improvement initiatives to reduce cycle time, revisits, and slippages.
- BE/B.Tech (Electrical/Electronics/Instrumentation/Mechanical) required
- MBA/PGDM (Operations/Project/Systems) preferred
- PMP/Prince2/MSP certification preferred
- 20+ years total experience, with 8–12+ years in program planning / project controls / PMO leadership on large rollouts
- Exposure to utility / distribution / metering / telecom/network deployment programs strongly preferred
Experience Level
Senior LevelJob role
Work location
Ahmedabad, Gujarat, India
Department
Project & Program Management
Role / Category
Operations Planning & Control
Employment type
Full Time
Shift
Day Shift
Job requirements
Experience
Min. 8 years
About company
Name
Adani Enterprises Ltd
Job posted by Adani Enterprises Ltd
Apply on company website