Senior Manager - Mechanical, Electrical, Plumbing & Public Health Engineering (MEP-PHE)
Larsen & Toubro Ltd
Apply on company website
Senior Manager - Mechanical, Electrical, Plumbing & Public Health Engineering (MEP-PHE)
Larsen & Toubro Ltd
Mumbai/Bombay
Not disclosed
Job Details
Job Description
MEP-Sr.Manager
In the high-stakes environment of Lock & Key (Turnkey) projects, the Senior MEP-PHE Manager (Mechanical, Electrical, Plumbing, and Public Health Engineering) is the technical strategist responsible for the building’s life-support systems. While "Finishing" provides the skin of the project, the PHE and MEP systems provide the functionality.
On a turnkey project, the "Key" cannot be handed over if there is a single leak, a noisy pipe, or a drainage foul-up. The Senior PHE Manager ensures that the water supply, fire suppression, and sanitation systems are engineered to a "Five-Star" standard, integrated invisibly into luxury finishes, and fully commissioned for immediate, trouble-free occupancy.
I. Strategic Core Responsibilities
1. Public Health Engineering (PHE) & Infrastructure Design
The Senior Manager must ensure the "PHE" element is robust enough to handle peak loads while remaining silent and efficient.
Water Hydraulics & Pressure Management: Designing and overseeing the installation of booster pump sets and PRVs (Pressure Reducing Valves) to ensure consistent water pressure at the 20th floor is identical to the 1st floor, without "water hammer" noise.
Drainage & Sanitation Systems: Overseeing the installation of soil, waste, and vent pipes. In turnkey projects, the Manager must ensure that acoustic lagging is applied to all internal drainage to prevent the sound of running water behind high-end bedroom walls.
Water Treatment & Filtration: Managing the implementation of central filtration, UV sterilization, or water softening systems to ensure the "Turnkey" product provides potable-grade water from day one.
2. Integrated MEP Coordination (The "Hidden" Engineering)
The Senior Manager ensures that MEP services do not compromise the "Lock & Key" aesthetic.
BIM-Led Clash Resolution: Leading the coordination between PHE pipes, HVAC ducts, and electrical trays. In luxury fit-outs, ceiling voids are tight; the Senior Manager must ensure that a 4-inch drainage pipe (which requires a specific slope) takes priority in the spatial hierarchy.
Hot Water Generation: Managing the installation of central boiler plants or solar water heating systems, ensuring that "return-loop" systems are balanced so that hot water is available at any tap within three seconds of being turned on.
Fire Suppression (PHE-Fire Integration): Overseeing the installation of fire pumps, hose reels, and sprinkler networks in strict accordance with NFPA or local Civil Defense codes, ensuring they are aesthetically integrated into decorative ceilings.
3. Quality Assurance & "Zero-Leak" Protocol
In a turnkey project, a water leak after the "Key" is handed over is a catastrophic failure that destroys expensive finishes (carpets, joinery, wallpaper).
Hydrostatic Testing Strategy: Implementing a rigorous 24-hour pressure testing protocol for all pressurized lines. No wall is closed, and no ceiling is fixed until a "Leak-Free Certificate" is issued for that specific zone.
Sanitaryware Fit-Out (Final Fix): Overseeing the installation of high-end, often bespoke, sanitary fixtures (wall-hung toilets, concealed cisterns, Hansgrohe/Kohler mixers). The Senior Manager ensures that the "rough-in" dimensions were perfect so that the final plates sit flush against the marble or tile.
Sterilization & Chlorination: Leading the flushing and chlorination of the entire water network to ensure the system is biologically safe before the client moves in.
4. Commissioning & Authority Handover
T&C (Testing & Commissioning): Developing a comprehensive T&C plan that includes pump performance curves, sensor calibrations, and BMS (Building Management System) integration.
Utility Liaison: Managing the relationship with city authorities for permanent water and sewerage connections (e.g., SEWA, BWSSB, or local equivalents), ensuring all meters and accounts are ready for the "Lock & Key" transfer.
II. Technical Proficiency & Domain Expertise
The Senior Manager must be a master of international and local PHE/MEP codes:
PHE Standards: Deep knowledge of IPC (International Plumbing Code), UPC (Uniform Plumbing Code), and ASPE standards.
Pumping Systems: Expertise in Variable Speed Drive (VSD) pumps and intelligent pumping stations.
External Services: Knowledge of stormwater management, grease traps for commercial kitchens, and sewage treatment plants (STP).
Sustainable Engineering: Implementation of greywater recycling and low-flow fixtures for LEED/Green Building compliance.
III. Required Qualifications & Experience
Education & Professional Status
Academic: Bachelor’s or Master’s Degree in Mechanical Engineering or Civil/Environmental Engineering with a focus on Public Health.
Professional: Membership in CIPHE (Chartered Institute of Plumbing and Heating Engineering) or ASPE is highly preferred.
Software: Mastery of Revit MEP, Navisworks, and hydraulic calculation software (like WaterGEMS or Pipe-Flo).
Professional Experience
Duration: 15+ years in MEP construction, with at least 8 years specifically managing PHE/Plumbing divisions on large-scale Turnkey projects.
Portfolio: Successful delivery of luxury hotels, high-rise residential towers, or large-scale healthcare facilities.
IV. Soft Skills & Behavioral Competencies
Meticulous Technical Review: The ability to find a 1% slope error in a 100-meter drainage run just by reviewing a drawing.
Cross-Disciplinary Diplomacy: Effectively negotiating with the Interior Designer to move a soil pipe that interferes with a decorative feature.
Risk Foresight: Identifying potential "single points of failure" in the water or fire system and engineering redundancies before construction begins.
Crisis Management: Remaining calm during the high-pressure "Final Commissioning" phase when systems are being pushed to their limits for the first time.
V. Key Performance Indicators (KPIs)
Water-Tightness Index: Zero reported leaks within the first 12 months post-handover.
Pressure Consistency: 100% adherence to designed flow rates and pressures at all terminal outlets.
Authority Clearance: Obtaining all "No Objection Certificates" (NOCs) from utility providers 30 days prior to project completion.
Cost Control: Managing the PHE/MEP budget within a ±3% variance through effective procurement and waste reduction.
Job role
Work location
Mumbai
Department
Construction & Site Engineering
Role / Category
Construction - Project & Site Management
Employment type
Full Time
Shift
Day Shift
Job requirements
Experience
Min. 15 years
About company
Name
Larsen & Toubro Ltd
Job posted by Larsen & Toubro Ltd
Apply on company website