Deputy Manager - Electrical Project Commissioning
Adani Enterprises LtdMundra
Not disclosed
Job Description
Deputy Manager - Project Commissioning
a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; }
1. Electrical Commissioning & Execution- Plan and execute electrical pre-commissioning and commissioning activities for:
- 11kV / 33kV HT & LT systems
- Substations, transformers, switchgear (HT/LT panels, MCCs)
- Power distribution systems, bus ducts, cable trays & cabling
- UPS, DG sets, solar auxiliary power systems
- Carry out testing, energization, and synchronization of electrical systems in coordination with OEMs and EPC contractors.
- Ensure commissioning of process equipment electrical systems for:
- Solar cell lines (diffusion, PECVD, screen printing, firing, testing)
- Module assembly lines (stringer, laminator, framing, testing)
- Commission and hand over electrical systems for utilities including:
- Clean room power systems
- Chillers, HVAC, compressors, vacuum systems
- Process exhaust, scrubbers, and gas safety electrical interfaces
- Validate load calculations, demand planning, and redundancy philosophy during commissioning.
- Ensure commissioning activities comply with:
- Electrical Safety Rules, CEA regulations, IE Rules
- Factory Inspectorate & DISCOM requirements for power charging
- Conduct risk assessments, JSA, permit-to-work, and LOTO during commissioning.
- Ensure documentation and sign-offs for statutory inspections and approvals prior to energization.
- Coordinate with:
- EPC contractors
- OEMs (process equipment, switchgear, transformers, DGs, UPS)
- Operations, EHS, Maintenance & Quality teams
- Review vendor drawings, commissioning procedures, test reports, and punch lists.
- Close punch points and ensure smooth handover to Operations & Maintenance.
- Prepare and validate:
- Electrical commissioning checklists & SOPs
- FAT/SAT reports
- Single line diagrams (SLD) – as-built
- O&M manuals and training documents
- Support training of O&M teams prior to final project handover.
- 6–8 years of experience in electrical commissioning for:
- Solar PV manufacturing / semiconductor / large industrial plants
- EPC or owner’s project execution roles
- Hands-on exposure to utility-scale manufacturing facilities is strongly preferred.
Experience Level
Senior LevelJob role
Work locationMundra, Gujarat, India
DepartmentProduction / Manufacturing / Engineering
Role / CategoryPower Generation
Employment typeFull Time
ShiftDay Shift
Job requirements
ExperienceMin. 6 years
About company
NameAdani Enterprises Ltd
Job posted by Adani Enterprises Ltd
Similar jobs you can apply for
Manufacturing - Engineering
Electrical Maintenance Supervisor
adani capital pvt ltdMundra

Electrical Project Engineer
adani capital pvt ltdMundra
Electrical Project Engineer
Adani Enterprises LtdMundra
Electrical Site Engineer
Adani Enterprises LtdMundra

Electrical Site Engineer
adani capital pvt ltdMundra
Electrical Maintenance Supervisor
Adani Enterprises LtdMundra