adani capital pvt ltd

Senior Manager - Electrical Projects

adani capital pvt ltd
Mundra
Not disclosed
Work from OfficeWork from Office
Full TimeFull Time
Min. 15 yearsMin. 15 years

Job Description

Manager - Electrical Projects

Responsibilities

Strategic Roles & Responsibilities 1. Erection, Testing & Commissioning of 66KV GIS and above switch yard with all associated equipment’s CB, CT, PT, CVT, Isolator, LA, Protection Relay, CRP Panel, RTCC, Power Transformer, SCADA, SAS, Battery Charger etc. 
2. Testing, commissioning, Programming of protection relay & Trouble shooting.
3. Tripping Data analysis of various Electrical faults in electricall system.
4. Erection, Commissioning and testing of HT & LT Switchgear Panel, Fast Bus Transfer system,11kV RMU,11kV HT & LT Motor, NGR, Distribution transformer 11/0.433KV,  PCC, MCC Panel, APFC Panel, AMF Panel & Synchronization system.
5. Erection, commissioning and testing of DG set & UPS system.
6. Erection, Commissioning and testing of PLC, SCADA based electrical system & trouble shooting.
7. Trouble shooting of large industrial utility system i.e. Air Compressor, AHU, VFD, HT/LT Motors/Water Treatment plant/HVAC/Gas Management system /VAM and its associated electrical system.
8. Effective Erection, Commissioning and Test of 11/33/66kV network & LT/HT Network of the plant.
9. Energy reports and MIS report preparation/checking 
10. Spare parts and inventory management.
12. Preparation of SOP & E&C schedules, checking for proper adherence of PM schedule.
14. Safety awareness and implementation.
15. Familiar with HSE, QMS and Value Engineering.
  
Technology and IT EnablementMS Office, SAP  
KRAs with   Outcomes ( Jobs which brings value to the organisation)   
DomainKeys Result AresOutcomes  
Electrical /Utility- Construction management (66kV GIS,11kV HT & LT Power network, MSTPL  HT Network )1.Ensure uninterrrupted power supply during E&C of Cell & Module plants and its auxilairy equipments as per specified quality.
2. Adopt safe & Best Practices for E&C of Electrical equipments
3.Equipment maintenance analysis for effective operation and maintenance.
4.Harmonics Analysis in system and corrective measures & control with in specified limits
5 Protection Realy testing & parameterisation.
Uninterrupted power supplies to all users. 
System reliability improvement1. RCFA report preparation 
2. System study & improvement planning 
3. Followup & compliance of shutdown, pending jobs/modifications etc.
Maintaining system service uptime  
Material management1. Material mIn-max implementation
2. Creating PR & followup action for make the material at site 
3. Checking for project electrical material requirements & action plan to make the same available at site
Reduction of downtime due to lack of spares 
Organization Building and Development1. Personal Development initiatives
2. Implementation of 5S & KAIZEN system
2. Create a culture of vibrant and motivated work atmosphere                 
3. Training of Contractor manpower & subordinate                             
Establish and Develop a Strong Organisation and Teamwork. 
Safety practices improvement 1. Strict adherence of safety protocol 
2. Steps for implementation of safe working practices 
3. LOTO & PTW practice improvement 
Developing safe work environment and safe Working practices 
Stake Holders    
InternalExternal  
Management, Employees & Utility UsersGovernment Bodies, Suppliers, Contractors & Society  
Competency   
Technical Competency ( To be filled by HM & HR ) Behavioural Competency  
CompetencyDesirableCompetency Desirable
Project Management SkillsPL - 2Strategic Orientation PL - 2
Development skillsPL - 2Entrepreneurial Mind-setPL - 2
Understanding of technical specifications of equipmentPL - 2Stakeholder Partnering PL - 2
Cost EstimationPL - 2Outcome Orientation PL - 2
Team BuildingPL - 2Transformation Focus PL - 2
Internal Stakeholder Management PL - 2Innovation Focus PL - 2
Inspection & Testing PlanPL - 2Team Orientation PL - 2
  Employee Development PL - 2

Qualifications

Educational Qualification: B. E / B. Tech Electrical 

Experience:  Minimum 15 to 20 year

Job role

Work location
Work locationMundra, Gujarat, India
Department
DepartmentProduction / Manufacturing / Engineering
Role / Category
Role / CategoryConstruction / Manufacturing Management
Employment type
Employment typeFull Time
Shift
ShiftDay Shift

Job requirements

Experience
ExperienceMin. 15 years

About company

Name
Nameadani capital pvt ltd
Job posted by adani capital pvt ltd

Similar jobs you can apply for

Power Generation
Adani Enterprises Ltd

Electrical Maintenance Supervisor

Adani Enterprises Ltd
Mundra
Work from Office
Full Time
Min. 15 years
adani capital pvt ltd

Electrical Maintenance Supervisor

adani capital pvt ltd
Mundra
Work from Office
Full Time
Min. 15 years
adani capital pvt ltd

Engineering Manager

adani capital pvt ltd
Mundra
Work from Office
Full Time
Min. 3 years
adani capital pvt ltd

HVAC Engineer

adani capital pvt ltd
Mundra
Work from Office
Full Time
Min. 9 years
Adani Enterprises Ltd

HVAC Engineer

Adani Enterprises Ltd
Mundra
Work from Office
Full Time
Min. 9 years
adani capital pvt ltd

HVAC Engineer

adani capital pvt ltd
Mundra
Work from Office
Full Time
Min. 3 years